Author Archives: Roger Hess

Inside the Center for Science and Business – May Construction

A group of professors and college officials received their first glimpse inside of  the Center for Science and Business last week. Here are some photos of their tour. The final steel beam was lowered into place April 26.  The beam … Continue reading

Posted in Uncategorized | 103 Comments

Roger Hess gives 1330 WRAM a Construction Update

Construction manager Roger Hess discusses the progress of construction with 1330 WRAM host Vanessa Wetterling. You may listen to the podcast here: http://1330wram.com/podcasts/?p=episode&name=2012-05-02_hess420.mp3

Posted in Uncategorized | 111 Comments

April Construction

The green material that is being applied here is a air and water vapor barrier to keep moisture out of the building. The new building will be 61 feet tall from the first floor. The gray “fuzzy stuff” on the … Continue reading

Posted in Uncategorized | 106 Comments

Super Structure work continues on new Science/Business Building

Posted in Uncategorized | Tagged | 2,570 Comments

The Highest Point in Monmouth arrives

Posted in Uncategorized | Tagged | 2,187 Comments

November Construction

Posted in Uncategorized | Tagged | 1,796 Comments

Summer Projects

Those of you who have been away from campus for the last weeks or months may be surprised by the number of projects already underway. The buildings along 11th Street that were previously used by our physical plant operations have … Continue reading

Posted in Uncategorized | 2,328 Comments