April Construction

The green material that is being applied here is a air and water vapor barrier to keep moisture out of the building.

The new building will be 61 feet tall from the first floor.

The gray “fuzzy stuff” on the beams is cementious non-asbestos fibrous fireproofing and the silver “icicles that are hanging down from the floors are metal hangers to support the mechanical air ductwork.

This entry was posted in Uncategorized. Bookmark the permalink.